Old Factory Demolish

Demo Image

Old Factory Demolish

Different steps are involved in the process of demolition of Factory structures which are: Surveying Removal of hazardous materials Preparation of plan Safety measures Surveying of Factory for Demolition Surveying means study of different parameters of the structure and its surroundings. There are two types of surveying are mainly conducted. They are Building surveying, .Structural surveying. In survey of buildings for demolition, following process are carried out: Types of construction material used, Usage of building prior and present during demolition.The presence of wastewater, hazardous materials, matters arising from toxic chemicals, flammable or explosive and radioactive materials, etc. Drainage conditions and possible problems on water pollution, flooding and erosion. Shared facilities with adjoining building, including common staircases, partition walls. Adjoining pedestrian and vehicular traffic conditions The sensitivity of neighborhood with respect to noise, dust, vibration and traffic impact. Demo Image 100% Satisfaction Guarantee. High Standard Processes. 25+ Years Of Experience. Strong & Effective Team. Turnkey solution provider. Removal of Hazardous Materials If hazardous materials like asbestos minerals, petroleum contamination, and radioactive metals are found in the investigation of site for demolition. Specialized personals are called for the removal of the hazardous materials from the site prior to the demolition of structure. Preparation of Demolition Plan for Structures The location of the building to be demolished. The distances from the building to be demolished to its adjacent buildings, streets, structures and significant street furniture. The structural support systems of the building. A plan showing the procedure for the demolition of the building; detailed sequence of demolishing structural members; and the method of demolition to be adopted. A plan showing all precautionary measures for the protection of the public including hoardings, covered walkways, catch platforms, catch fans, scaffolding, protective screens and safety nets. Method of handling demolished building debris. Time required for the complete demolition process etc. Safety Measures during Demolition of Factory Building Structures All the workers, site supervisors and engineers including plant and equipment operators are briefed with the potential hazards and process of demolitions. All goods that are flammable are removed from the site unless it is used in the work involved. All the flammable materials like wood, timber, fuels etc. are stored in proper storage facilities. Firefighting appliances are stationed in the demolition site till the process is completed. Due to the demolition of structure, many problems are faced by the workers, such as. exposure to dust, chemical exposure, heat stress and ventilation, noise exposure, medical and first aid facilities, sanitation and occupational diseases. To overcome these problems suitable measures are undertaken.

Demo Image

Copyright @2022 SRI KAVI BUILDING DEMOLISHERS. Designed By AURORA iTech